Star Drilling has worked multiple rigs with GHD for two years drilling geotechnical bores for the three possible routes of the Northeast Link.
Addtional to it being Christmas, Star Drilling celebrated it's 10th year of operation with staff and their families with a day at the races.
This program involved drilling PQ3 bores down to a maximum of 150 metres and required quality core from the alluvial sediments.