Star Drilling spent three years geotechnical drilling for the Melbourne Airport Rail Link. A lot of drilling occurred on or under the E.J. Whitten Rail Bridge.
Addtional to it being Christmas, Star Drilling celebrated it's 10th year of operation with staff and their families with a day at the races.
This program involved drilling PQ3 bores down to a maximum of 150 metres and required quality core from the alluvial sediments.