Star Drilling has worked multiple rigs with GHD for two years drilling geotechnical bores for the three possible routes of the Northeast Link.
Addtional to it being Christmas, Star Drilling celebrated it's 10th year of operation with staff and their families with a day at the races.
The drilling specification called for a combination of sonic and air rotary drilling at a diameter of 250mm with the installation of 168mm 316 stainless steel screens.