16 July 2024
Remote Drilling on the Gove Peninsula in NT
Star Drilling installed 15m of 200mm 304 stainless steel screen to depth and developed the bore. The end result was a bore that produced close to 30 litres per second, exceeding the client’s expectations and requirements.